Everything from the meter socket to the last outlet plate.
- Service entrance: meter socket, weatherhead, and utility connection coordination with EPCOR, ATCO, or FortisAlberta.
- Main panel: 200A (standard) or 400A (larger homes, EV charging, or future-proofed builds) service panel selection and installation.
- Rough-in: all branch circuit wiring before drywall — outlets, switches, fixtures, bathroom fans, and appliance circuits.
- Kitchen circuits: dedicated circuits for refrigerator, microwave, dishwasher, and split 20A kitchen counter circuits to CEC requirements.
- Bathroom circuits: dedicated 20A bathroom circuits and exhaust fan wiring.
- Appliance circuits: dryer, range, oven, hot tub/spa stub-out, and future-use circuits.
- EV charger rough-in: dedicated 240V/50A or 240V/40A circuit stubbed out for EV charging — Level 2 ready.
- Smoke and CO detector wiring: interconnected smoke and CO detectors to National Fire Code requirements.
- Final inspection: all work permitted and inspected by the Authority Having Jurisdiction before occupancy.
Your home’s electrical system should last 40+ years without problems.
The electrical work that goes into a new home is largely invisible after drywall — which is exactly why it matters who does it.
A properly installed electrical system has: Pro Call Electric has been wiring new homes in Sherwood Park and Edmonton since 2005.
Our work passes inspection the first time.
- Correct wire gauge for every circuit (no undersized runs that create heat under load)
- Proper junction boxes, straps, and protection for cables in stud bays
- Panels labelled and organised for easy future maintenance and additions
- Work that passes first-inspection without deficiencies
Wire for the home you’ll want to live in.
We can include in your new home rough-in:
- EV charger circuit: 240V circuit for Level 2 EV charging in the garage — even if you don’t have an EV yet.
- Sub-panel in the garage or shop: for future workshop loads.
- Hot tub or pool stub-out: 240V circuit already in place when you’re ready.
- Cat6 structured wiring: home network cable rough-in with central distribution point.
- Speaker and low-voltage pre-wiring: in-ceiling speaker rough-in, doorbell, and security camera pre-wire.
Straightforward from quote to final inspection.
Quote: we walk the plans (or the site) and provide a written quote with scope and pricing — no per-outlet mysteries 2.
Permit: we pull the electrical permit — you don’t have to deal with the municipality 3.
Rough-in: we coordinate with your builder’s schedule and complete rough-in on time 4.
Trim-out: devices, plates, panel trim, and final connections after drywall and paint 5.
Inspection: we coordinate and attend the AHJ inspection and clear any deficiencies 6.
Energisation: we coordinate utility connection through EPCOR, ATCO, or FortisAlberta.