Pool and spa electrical installation in Sherwood Park, Edmonton, and surrounding Alberta.

Pro Call Electric installs pool, hot tub, and spa electrical systems in Sherwood Park and Edmonton — to the strict requirements of CEC Section 68, including dedicated circuits, GFCI protection, and equipotential bonding.

Home / Service

Water and electricity require strict safety standards — no shortcuts.

Pool and spa electrical work is regulated under CEC Section 68, which has specific requirements that go well beyond standard residential wiring: Getting pool and spa electrical wrong can create lethal shock hazards.

Pro Call Electric follows CEC Section 68 requirements — not general residential code — for every pool and spa installation.

  • Dedicated circuits: hot tubs require a dedicated 240V/50A or 240V/60A circuit with a GFCI disconnect within sight of the spa.
  • GFCI protection: all circuits within defined zones around pools and spas must have GFCI protection.
  • Equipotential bonding: all metallic components of the pool or spa — the shell, ladders, pump, heater, and surrounding metalwork — must be connected with a bonding conductor to prevent voltage differences that can cause electric shock drowning (ESD).
  • Setback requirements: receptacles, lighting fixtures, and overhead lines must maintain minimum distances from water per CEC Section 68.

From the panel to the disconnect box — complete and code-compliant.

  • Hot tub and portable spa connection: dedicated 240V/50A GFCI-protected circuit with disconnect box positioned to code.
  • In-ground pool electrical: pump motor circuit, underwater lighting, and GFCI protection.
  • Above-ground pool electrical: pump circuit and outdoor GFCI outlets.
  • Bonding systems: equipotential bonding of pool shell, pump, heater, and metalwork — the most critical safety component in pool/spa electrical.
  • Exterior GFCI outlets: weatherproof GFCI outlets at code-required distances from water.
  • Pool and patio lighting: outdoor lighting circuits for the pool area, patios, and pergolas.
  • Sauna electrical: dedicated 240V circuit for electric sauna heaters

Have the electrical ready before the tub arrives.

Most hot tub dealers will tell you to have the electrical ready before delivery day.

The standard requirement is: Lead time: Pro Call Electric typically needs 1-2 weeks to schedule and complete the permit process.

Plan your electrical ahead of delivery day.

  • 240V/50A or 240V/60A dedicated circuit (check your tub’s owner manual for exact requirements).
  • 4-wire connection (two hot legs, neutral, and ground).
  • GFCI disconnect mounted within sight of the tub, at the setback distance required by CEC Section 68.
  • Conduit run from the panel to the disconnect, then to the tub’s junction box.

Why Choose Pro Call Electric?

At Pro Call Electric, we deliver top-tier electrical engineering and contracting services. From complex industrial automation to commercial infrastructure, our certified team ensures your systems are safe, reliable, and optimized for performance.

Experienced Electric Experts
Premium
Materials
Long-Term Durability
Custom
Solutions
Safety & Compliance

Our Process

We follow a step-by-step process to guarantee quality and customer satisfaction:

Frequently Asked Questions

Yes, all of our electricians are fully licensed, certified Master Electricians, and covered by comprehensive liability insurance and WCB in Alberta and British Columbia.
We serve industrial facilities (oil & gas, mining, water treatment), commercial buildings, and high-end residential properties.
Yes, we offer priority emergency support for our contract clients to minimize downtime and resolve critical electrical faults.
Safety is our core priority. We are SECOR certified, members of ISNetworld, and adhere strictly to C22.1 Canadian Electrical Code (CEC) and OHS regulations.